BAIFA BAIFA

/
/
/
Oil and Gas Field
LATEST NEWS
2021-07-30

2020, the main power supply for drilling platform construction Fujian

On July 7, 2020, the Fujian Putian Pinghai Bay Offshore Wind Power Zone F project undertaken by Longyuan Zhenhua, a subsidiary of Zhenhua Heavy Industry, successfully completed the first 7-meter diameter type III rock-socketed monopile drilling construction.
Ver detalles
Página anterior
1

Contact

Add: No. 972, Antai 3rd Road, Xishan Eco & Tech Development Zone, Wuxi, Jiangsu , China. 214106

BAIFApower.com | Privacy | BAIFA© 2019 All Rights Reserved.  Powered by:300.cn    苏ICP备19027668号-1    苏ICP备19027668号-2